Laserfiche WebLink
E~: Bischoff, MLR • <br />2-28-84 <br />Page 2 <br />On January 10, 1984, the Mine sent a grazing plan to MLRD for <br />approval. If the Division finds this plan unacceptable, Pf,M would <br />still desire a meeting to further discuss grazing. Mine personnel <br />would be available early in March to meet either here at the mine <br />site or in Denver. However, a meeting would not be necessary if <br />MLRD accepts PF,M's grazing proposal. Either way, this issue needs <br />to be resolved as soon as possible. <br />Sincerely, <br />Mike Campbell <br />Reclamation Technician <br />