Laserfiche WebLink
+.4 _~.. <br />• <br />EC-6 and EC-12 will <br />samples from sites <br />subsamples. <br />• <br />contain a minimum of three subsamples. Soil <br />EC-4, EC-7, and EC-9 will contain a minimum of two <br />Sample Results and Conclusions <br />Sample results will be forwarded to the Division as soon as possible. <br />Please keep in mind that a deadline of December 15, 1986 has been set <br />and agreed upon by the Division and Kaiser Coal Company for submission <br />of a final reclamation plan and cost summary for the Elk Creek Yard <br />Area. The final reclamation plan should be based on the results from <br />soil samples taken in 1980, 1983, and 1986: The December 15, 1986 <br />deadline is from amended Stipulation No. 2 of the Somerset Mine <br />Idid-Term Review and can be found in-my letter of October 15, 1986. <br />Sincerely, <br /> <br />Thomas A. Schreiner <br />Reclamation Specialist <br />TAS/iml <br />5336E <br />