Laserfiche WebLink
;- °. <br />,/~ Stipulation No. <br />Status: <br />l~ Stipulation No. <br />Status: <br />t} Stipulation No. <br />(/ Status: <br />OStipulation No. <br />Status: <br />-5- <br />24: Topographic monitoring, Swell Verificaition, and Annuai <br />Report <br />Unresolved, delinquent. <br />25: Phase IX Overburden Stockpile Revision <br />Unresolved (future deadline). <br />26: Culvert Inlet Structure Designs. <br />Resolved (November 9, 1981). <br />27: Reclamation Fee information. <br />Resolved (November. 9, 1981). <br />/OStipulation TR No. 1: Modification of NPDES permit for Walden Load-out. <br />Status: Resolved (April 3, 1983). <br />Summary of Stipulation Status <br />Resolved: 2, 5, 6, 7, 10, 14, 18, <br />Ongoing (or unresolved with Future <br />Unresolved, Delinquent: 8, 9, 12, <br />IC. Summary of Revisions <br />Minor Revision No. l: Modification <br />(August 6, 1 <br />19, 22, 23, 26, 27, TR No. 1 <br />deadline}; 1, 3, 4, 11, 13, 16, 25 <br />15, 17, 20, 21, 24. <br />of deadline for Stipulations 13, 18, 19, 20 <br />382) <br />Action: Approved deadline modification for Stipulation No. 13; denied <br />modification for stipulations 18, 19. 20 (September 3, 1982) <br />Technical Revision No. l: Addition of Load-out Facility in Walden, <br />Colorado (September 10, 1982) <br />Action: Approved with one stipulation (August 5, 1983). <br />III. Bonding <br />The Division has reviewed both the amount and conditions of the bond for the <br />Canadian Strip Mine and Walden Load-out in accordance with Rule 3.02(4). The <br />Division finds that Wyoming Fuel Company needs to reevaluate and resubmit the <br />performance bond (if reevaluation dictates) based on the following concerns: <br />a. Performance bond calculations contained in the permit application <br />are based on costs calculated in 1981. Costs need to be recalculated <br />based on 1984 rental casts and prices the Division would incur in the <br />event of forfeiture. Detailed cost estimates for the worst case <br />situation based on existing conditions at the mine and published <br />production and rental rates need to be submitted for Division review and <br />incorporation into the permit. <br />