Laserfiche WebLink
<br />-3- <br />All material should be noted as revised and dated and incorporated by <br />Wyoming Fuel into the permit application document. <br />2. Hydrologic Balance:. Ground and Surface Water <br />The permittee has not been submitting ground and surface water monitoring data <br />as required by Stipulations 8, 9, and 12. Therefore, the Division has not <br />been able to assess whether any unpredicted impacts have occurred at the mine. <br />3. Operations Plan <br />Oue to temporary cessation of operations, Wyoming Fuel has greatly curtailed <br />the scope of activities at the Canadian Strip. The projected timetables <br />present in the permit application no longer accurately reflect the scope or <br />timetable for mining and reclamation at the Canadian Strip. Wyoming Fuel <br />should submit a revised proposed schedule for mining, backfilling and grading, <br />and reclamation activities at the mine. <br />4. Backfilling and Grading/AOC <br />The Division has become concerned regarding the extent and size of Pit No, i <br />relative to the amount of remaining overburden material in the stockpile. <br />Given the questions posed during the permit review, and the requirements of <br />Stipulation No. 24, the Division is concerned that Wyoming Fuel may be unable <br />to achieve approximate original contour should mining be curtailed, or <br />limited. The Division is therefore requiring a demonstration that Wyoming <br />Fuel can achieve approximate original contour, based on conditions existing at <br />the site now. This demonstration should be based on information obtained to <br />fulfill Stipulation No. 24. <br />I8. Status of Stipulations <br />Stipulations are referred to numerically and in the same sequence present in <br />the October 29, 1981 Colorado Mined Land Reclamation Division Findings <br />Document and Proposed Decision. <br />Stipulation No. 1 <br />Status: <br />Stipulation No. 2: <br />~ StdtUS: <br />~' Stipulation No. 3 <br />Status: <br />~~,Stipulation No. 4 <br />Status: <br />'/Stipulation No. <br />Status: <br />Site eligibility and operational restrictions for <br />archaeological sites. <br />Unresolved (future deadline). <br />Pond No. 1 spillway construction and certification. <br />Resolved (May 19, 1982). <br />Pond No. 4 and Temporary Impoundment No. 1 certification. <br />Unresolved (future deadline). <br />Pond No. 4 water monitoring/report. <br />Unresolved (future deadline). <br />5: Water rights for Temporary Impoundment N0. 1/Ditch <br />designs. <br />Resolved (April 15, 1982). <br />