Laserfiche WebLink
Table 2: Financial Warranty Determinations <br /> 4. Rip 75 percent of Area A due to compaction = 35.9778 acres $ 2,612.75 <br /> + product stockpile in Amendment 1 South = _2.1646 acres <br /> TOTAL = 38.1424 acres <br /> DMG rates for ripping at $1507.00 over 22 acres = 68.50/acre. <br /> 38.1424 acres x $68.50/acre ripping = <br /> 5. Manure 75 percent of Area A + Product Stockpile Area in $ 500.00 <br /> Amendment 1 South at apx. 50 to 100 yards per hour at $ 50.00/hour <br /> over a rate of 10 cu yards per acre or 36.0 + 2.0 acres or 38 acres = <br /> less than one day's work @ $ 500.00 per day for a manure spreader <br /> (manure applied prior to discing, already provided for under <br /> revegetation) = <br /> Note: Turkey manure is free to the site in any quantity, and analyzed <br /> (see attached). <br /> 6. 3.0 acres rate of fill of Area C x $ 238.50/acre revegetation = $ 714.60 <br /> 7. Approximate cost of Mobilization/Demobilization (per Dakolios) $ 2,000.00 <br /> 8. Administrative cost of 21.8 percent of sub-total (1-7) $ 15,706.14 <br /> Sub-total = $ 72,046.54 x .215 = <br /> GRAND TOTAL = $ 87,752.68 <br /> Of the current financial warranty of $139,500.00, and an additional $ 30,312.50 required for <br /> Amendment 2 (prior to opening up that area for extraction), the present day real world level of <br /> reclamation of liability is approximately $ 82,059.82 below that presently warranted for. <br /> Therefore, pending release of those areas, adequate warranty exists for all affected lands to <br /> date. <br /> 3 <br />