<br /> <br /> <br />Finally, the vegetation which currently exists within the lower wetland pond will be <br />transplanted into the two lower constructed basins. All disturbed areas associated with <br />the construction of the wetland treatment system will requue topsoiling and revegetation <br />as described in Tasks 2 and 6. <br />Measurement and Payment <br />There will be no measurement for payment for this task. Payment for this task will be <br />reflected in a lump sum bid under Item 4 on the Bid Schedule. This lump sum bid will <br />cover payment of all costs of whatever nature to provide complete construction of the <br />wetland system in accordance with the specifications. Payment shall be as this task is <br />completed and approved by the PROJECT MANAGER. Payment for this task shall be <br />made only for that amount shown under Item 4 of the Bid Schedule. Any or all <br />incidental costs incurred by the CONTRACTOR shall be reflected in each Bid Item or <br />shall be paid at the CONTRACTOR'S expense. <br />Task 5 EQUIPMENT RENTAL <br />ADDITIONAL DOZER WORK <br />Additional areas may require further slope reduction or erosion control measures such as <br />furrowing or basin construction. Dozer basins will be constructed throughout the <br />regraded areas to retain moisture for shrub establishment. Basin dimensions will <br />approximate 2X dozer blade width with a 48" depth. The PROJECT' MANAGER will <br />provide reference stakes to delineate basin locations. All work will be accomplished <br />according to 19.0 Equipment Rental of the "Standard Work Specifications". <br />Any additional dozer work which may arise will also be covered under this task. <br />Measurement and Payment <br />Payment for this task will be reflected under Item 4 of the Bid Schedule as an hourly <br />rate for a CAT D-7H or equivalent 215 I'IIP machine with operator. Bid howly rate <br />shall reflect the CONTRACTORS estimate for equipment and personnel costs per hour <br />to complete the task. Measurement will be actual hours required to complete work <br />outlined above and/or as duetted and approved by the PROJECT MANAGER. All of <br />the hours outlined under Item 4 aze NOT guaranteed. <br />