My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39980
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39980
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:17 PM
Creation date
11/23/2007 10:27:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984067
IBM Index Class Name
General Documents
Doc Date
9/14/1993
Doc Name
INVITATION TO BID
Permit Index Doc Type
RECLAMATION PROJECTS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
;, , ..~ <br />~~ <br />Measurement and Payment <br />Fencing will be measured to the neazest linear foot. Payment for this task will be paid <br />for at prices established in Item 7 of the Invitation and Bid sheet per lineal foot <br />installed. Such payment will be considered full compensation for all labor, materials, <br />equipment and all other items necessary and incidental to the furnishing and installation <br />of the barbed wire fencing as directed and described in the specifications. Payment will <br />be as this task is completed and approved by the Project Manager. Payment for this task <br />will be made only for the unit price shown under Item 7 of the Bid Schedule. <br />PROJECT OBSERVATION <br />The PROJECT MANAGER will be at the project site periodically to monitor <br />construction activities and ensure that each work item is completed and constructed to <br />design specifications. The PROJECT MANAGER will be available during regulaz <br />business hours (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled <br />on weekend days or holidays without prior approval of the PROJECT MANAGER. The <br />following items must be observed and approved by the PROJECT MANAGER before <br />proceeding with additional work: <br />1. Compaction of channels prior to lining with riprap <br />2. Location of wetland ponds prior to excavation <br />3. Final grades prior to topsoiling procedures <br />4. Final configuration of all areas prior to revegetation <br />m:\imp\ahared\~gulch.bid <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.