<br /> <br />See also Section 1.0 of the "Standazd Work Specifications" included in CDMG General <br />Bid Specifications, 1993. <br />The CONTRACTOR shall exercise caution during mobilization, performance of all work <br />tasks, and demobilization in order to avoid damage to public and private property <br />including, but not limited to, pavements, soils, vegetation, water supplies, fences, walls, <br />structures, existing sediment ponds, landscaping etc. The CONTRACTOR shall repair <br />and restore public or private property damaged during the work at his expense. <br />The CONTRACTOR shall be fully responsible for any and all damage to property <br />caused by his equipment or personnel. The CONTRACTOR shall ensure that the job <br />site is restored to original or better condition and that the PROJECT MANAGER <br />accept that the work is complete. <br />Measurement and Payment <br />No measurement for payment shall be made for mobilization and demobilization. A <br />lump sum bid for mobilization and demobilization shall be reflected under Item 1 of the <br />Bid Schedule. Payment of two-thirds of the lump sum price will be made with the first <br />monthly progress payment after completion of the work described above for <br />mobilization. Payment of one-third of the lump sum price will be made with the final <br />progress payment for the work if demobilization has been completed. If the price bid for <br />mobilization and demobilization is greater than fifteen percent (15%) of the total <br />contract price, invoices supporting the mobilization costs will be required before payment <br />is approved. <br />TASK 2 EARTHWORK <br />OBJECTIVE <br />The overall objective of the earthwork task is to excavate waste borrow material from <br />the borrow location and place it against the existing cuts to reduce the slopes of the cuts. <br />A final topsoil cover will be excavated and placed over the final grades for revegetation. <br />During excavation, variable sized rock will be generated to be used for surface <br />drainageway construction. <br />The following quantities have been calculated to be used for earthwork. The following <br />volumes are ESTIMATIONS ONLY and aze stated to give the prospective bidders an <br />idea of what yardage amounts aze involved. The following figures are based on 3D maps <br />using AutoCOGO on the average end method using 50 ft. centers: <br />Waste for Fill 74,300 c.y. <br />Topsoil 16 2 c. . <br />Total Excavation 90,500 c.y. <br />Prior to initiating earthwork tasks, any remaining structures, equipment or materials left <br />behind from the previous mining operation will be completely removed from the site. <br />5 <br />