Laserfiche WebLink
~ ~ <br />SPECIAL CONDITIONS <br />Coal Gulch Bond Forfeiture Project <br />C-84-067 <br />RN-MINES-320 <br />PROJECT LOCATION <br />The Coal Gulch site is located 4.6 miles west of Durango on the Durango West (1963) <br />7 1/2 minute quadrangle in the NE 1/4, NE 1/4 Section 21, and the NW 1/4, NW 1/4 <br />Section 22, T35N, R10W. The site is accessed from State Highway 160 and is visible <br />from State Highway 160. <br />WORK SUMMARY <br />The project work will include the moving and replacing approximately 91,000 cubic yazds <br />of material against sidecuts produced by a previously active mining operation. The <br />project will proceed by first placing waste material against the toe of the cuts. This will <br />involve sorting riprap material. Following the removal and placement of the waste <br />material against the cuts, designated on-site topsoil stockpiles will be distributed over the <br />waste materials. Final grades will be directed at achieving proper drainage and <br />controlling erosion including channel and furrow construction. An existing wetland area <br />used for acid mine drainage treatment will be reconstructed including vegetation <br />transplanting. All disturbed azeas will be revegetated. <br />PRE-BID MEETING AND SITE SHOWING <br />A man pre-bid meeting and site showing will be held at the southeast end of the <br />Red Lion Inn parking lot, 501 Camino Del Rio, in Durango. This mandatory meeting <br />will take place on September 28, 1993 at 9:00 a.m. <br />The Pre-Bid Meeting is for the purpose of showing prospective bidders the work site and <br />vicinity. Bidders aze advised to be prompt. A sign-in sheet will be available at the Pre- <br />Bid meeting for firms to register their attendance. It is the bidder's responsibility to <br />make certain their attendance is recorded on the sign-in sheet. Failure to sign-in or to <br />attend the entire meeting will be cause for rejection of a bid. <br />Bidders are cautioned that, notwithstanding any remarks or clarifications given at this <br />meeting and site showing, all terms and conditions of the contract documents remain <br />unchanged unless they aze changed by written amendment issued by the OWNER. if the <br />answers to questions, or any amendment to the contract documents create ambiguities, it <br />is the responsibility of the bidder to seek clarification prior to submitting a bid. <br />BID OPENING DATE <br />The bid opening date for this project is October 12, 1993 at 2:00 P.M. Please see <br />Number 2 of the "General Conditions". A written tabulation of the Bid results will be <br />available to those bidders who submit aself-addressed stamped envelope with their bid. <br />Telephone requests cannot be honored because of time constraints. <br />