My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39924
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39924
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:15 PM
Creation date
11/23/2007 10:25:45 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981037
IBM Index Class Name
General Documents
Doc Date
2/9/1994
Doc Name
UPDATE ON VARIOUS ISSUES NEWLIN CREEK MINE C-81-045
From
DMG
To
CORLEY CO
Permit Index Doc Type
GENERAL CORRESPONDENCE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
:- <br /> <br />5. Road Re-establishment <br />Now that the lowermost 310 feet of the road has been re- <br />established, the permit needs to reflect this fact. A letter <br />to the Division together with a minor revision to update <br />Section 4.03; "Roads", page 22 is necessary. A minor revision <br />form is included for your convenience. <br />Since the road has been re-established, and it is now possible <br />to drive to the Rex Carbon portal for inspections, would it <br />also be possible for the Division to obtain a key for the gate <br />to access the mine site? A key to the gate and vehicular <br />access would definitely reduce the time spent conducting <br />inspections on the mine site and eliminate the need to walk <br />the length of the road. Should you agree to provide the <br />Division with a key, the Division will agree to inform your <br />office just prior to the inspection, that an inspector will be <br />on the site. Thank you for considering the matter. <br />6. Phase II Issues <br />As promised, the Hydrology Task Force will meet tomorrow to <br />discuss the two Phase II issues, mainly removal of the <br />diversion ditches and final pond certification after removal. <br />I will let you know the decision next week on these two items. <br />The Division is awaiting a copy of the proof of publication to <br />be submitted to our office. Upon receipt of the proof of <br />publication, the Division will begin to coordinate a time for <br />a Phase II site inspection at the Newlin Creek site. <br />This concludes the brief on issues outstanding. Thank you for your <br />continued cooperation and patience. <br />Sincerely, <br />awn E. Smi <br />Environmental Protection Specialist <br />w/enclosures <br />ses/newlncor.94 <br />
The URL can be used to link to this page
Your browser does not support the video tag.