Laserfiche WebLink
_ Revision to Section 2.05.4 <br /> <br />Loadou`. Cost Si marl <br />F=,cilities Removal <br />Rail and Tie Removal <br />load, Haul and Dispose of <br />RR Ballast <br />Remove Fill <br />Replace Topsoil (RR) <br />Revegetation (RR) <br />Strip Facilities Pad <br />Replace Topsoil Facilities Pad <br />Revegetation (Pad) <br />S~ total <br />10°6 Administrative Cost <br />Total Loadout Cost <br />Total ~4ine Cost <br />GRA^;J TOTAL <br />$104,960 <br />167,370 <br />36,210 <br />148,288 <br />24,785 <br />35,340 <br />4,535 <br />5,581 <br />14,880 <br />R•541,949 <br />54,1~~ <br />$ 596,144 <br />$1,526,122 <br />32,122,2E6 <br />• <br />Revised Sep'.ember, 1984 <br />