Laserfiche WebLink
,._~.-ision to Section 2.05.4 • <br />, <br />Revegetation Costs (P.R <br />38 acres x $930/acre <br />535,340 <br />Strip and Haul Facilities Pad - 10,000 yd3 <br />.25 mi?~ haul dist. - 2.7 min. cycle time <br />455 yd~/hr production rate <br />10,000 yd3 s 455 yd3/hr = 22 hours <br />Scraper = 22 hours x 51'5.21 = $4,075 ' <br />Operator = 23 hours x X20/hr = 460 <br />4,535 <br />Replace Topsoil - Faci~~ities Area - 10,000 yd3 <br />.33 mi. loaded = .8 min <br />.33 mi. empty = .8 min <br />load = .9 min <br />dump - .6 min <br />spot delay - .2 min <br />3.3 min <br />10,000 yd3 369 yd3/hr = 27 hours <br />Scraper = 27 hours x 185.21 = <br />Labor = 29 hours x $20/hr = <br />Revegation at Facilities Area <br />16 acres x $930/acre <br />14,880 <br />Revised September, 1984 <br /> <br />tripsJ50 min. hr = 15 <br />eff = 90'0 <br />cap = 27.3 yd3 <br />15 x .9 x 27.3 = 369 yd3/hr <br />$5,001 <br />580 <br />5,581 <br />:: <br />