Laserfiche WebLink
Page Two <br />A;zil 16, 1981 <br />Most of these smaller operations are now bonded for the entire acreage <br />of the permit. Re advised that the surety be regritten to cover the total <br />16 acres at the Newett Quarry. We would then release portions of the surety <br />when phases of reclamation have been completed, if you should so desire a <br />partial release at any time. <br />The updated reclamation figures you submitted are within reason relative <br />to other operations we are updating. I have estimated the disturbance clasi- <br />fications below, and have increased the road reclamation costs by $100/ac. <br />Major Disturbance (Mining) 22 ac@$1,250/ac. <br />Moderate Disturbance (Roads) Sac@$ 700/ac <br />TOTAL $30,300 <br />If this is acceptable to you, please submit surety to cover the new <br />sum. Enclosed is the corporate surety form to accompany the new surety. <br />We will send back the old surety upon receipt of the new. <br />Thank you for the cooperation you have shown with this matter. If you <br />have any questions, please call. <br />Sincerely, <br />Mike Stanton, <br />Reclamation Specialist <br />MS/cg <br />