Mazch 17, 1997, and has not yet cycled through the penalty assessment or appeals process. <br />Section III -Revisions to the Permit <br />Subsequent to the petmit renewal on June 16, 1994, EFCI has submitted and the Division has approved <br />five technical revision and nine minor revision applications. The revisions were as follows: <br />Technical Revision (TR) 26 -This revision revised the post-mining topography, based on a more <br />accurate survey of the existing topography. The revision was submitted on December 5, 1996, and <br />approved on February 5, 1997. <br />TR-25 -Submitted on September 13, 1996 and approved on October 10, 1996, this revision added .4 <br />acres to the permit boundary. The additional acreage was necessary to allow for reclamation and the <br />return to approximate original contour at the loadout azea. <br />TR-24 -This revision was submitted on February 28, 1996 and approved on April 8, 1996. DMG <br />granted a reduction in subsidence monitoring along the high-resolution grid, since 12 years of <br />monitoring data indicated subsidence was within predictions. <br />1'R-23 -This revision clarified the reclamation responsibilities of the Magpie Creek diversion between <br />EFCI and a neighboring mine. A portion of the Monarch Fan Road which was within the neighboring <br />mine permit area was removed from the Southfield Mine permit area. The revision was submitted on <br />December 13, 1995 and approved on March 7, 1996. <br />TR-22 -Submitted on October 18, 1995 and approved on Febmary 5, 1996, this revision designated <br />as a haul road the refuse pile access road. <br />TR-21 - A revised loadout drainage control plan was submitted on May 22, 1995 and approved on <br />August 21, 1995. <br />Minor Revision (MR) 33 -This revision provided disposal and reclamation plans for coal fines in the <br />loadout yard area. It was submitted on September 18, 1996, and approved October 10, 1996. <br />MR-32 - A revised, more detailed legal description was submitted to the Division on May 7, 1996 and <br />approved on June l3, 1996. <br />MR-31 -This revision revised the amount and location of stockpiled coal on site. It was submitted on <br />April 17, 1996 (incomplete) and on May 28, 1996, and approved on August l9, 1996. <br />MR-30 -This revision was submitted on April 16, 1996 and approved on May 3, 1996. The revision <br />modified the yard area of the mine, including removal of an interim settling pond between the <br />preparation plant and sedimentation pond. <br />MR-29 -This revision was submitted incomplete on March 6, 1996, and resubmitted March 6, 1996. <br />The clarification of hydrologic monitoring and reporting requirements was approved on April 8, 1996. <br />Southfield Mine (C-8I-030) April 18, 1997 <br />Midterm Review 3 Third Permit Term <br />