My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39719
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39719
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:06 PM
Creation date
11/23/2007 10:19:33 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981041
IBM Index Class Name
General Documents
Doc Date
8/15/2005
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
to the nature of the changes proposed, the Division determined that a technical revision application <br />would be necessary, rather than a minor revision application. A technical revision application <br />addressing the various reclamation plan amendments has not yet been submitted. <br />MR-69 proposed decision was issued July 25, 2005. The revision authorized installation of a septic <br />system for the former office building on the lower facility area level at the South Portal area, to <br />accommodate the current use of the building as a roadside fruit stand. The revision also incorporated <br />the applicable Mesa County Health Dept. permit into the DMG permit application. Additional <br />reclamation bond in the amount of $5848.00 was necessary, and was properly posted. A surety rider <br />from Liberty Mutual Insurance Company, to Bond No. 014-018-026, increased the reclamation bond <br />amount from 51,797,639.00 to 51,803,487.00. <br />Permit Revisions-None processed since RN-4 approval <br />Succession of Operators-None processed since RN-4 approval. <br />Surety Increases-None processed since RN-4 approval. <br />Bond Releases <br />SL-02 proposed approval decision was issued August 14, 2003, and is summarized in the August 26, <br />2003 RN-4 Findings document. The bond release review process is described in detail in the August <br />14, 2003 proposed decision and findings for Partial Phase 1 Bond Release Application SL-02. The <br />decision to approve the bond release became final on October 27, 2003. As a result of the bond <br />release decision, the reclamation liability was reduced by S1,466,510.00, resulting in a remaining <br />liability amount of 51,797,639.00. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.