My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL39630
DRMS
>
Back File Migration
>
General Documents
>
GENERAL39630
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:59:01 PM
Creation date
11/23/2007 10:16:10 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981034
IBM Index Class Name
General Documents
Doc Date
7/30/1986
Doc Name
Midterm Review Findings Document
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br /> <br />- 10 - <br />Condition No. 1: Implement mitigation measures in U.S. FWS <br />uu y~8~draft biological opinion and submit proof of compliance to <br />regulatory authority and OSM. Compliance shall be a contribution of <br />E1390.00 to Upper Colorado River Fishes Conservation Fund. <br />Status: Resolved (June 14, 1985). OSM confirmation <br />August 16, 1985. <br />Condition No. 2: Develop a plan of augmentation for replacement of <br />sur acme water Tost due to inundation of underground mine workings. <br />Status: Resolved (March 15, 1985). <br />Condition No. 3: Require additional cultural resource studies when it <br />is det'- a ed that subsidence has become a potential impact. <br />Status: Unresolved (future deadline). <br />Summary of Stipulation Status: <br />Resolved: 1, 2, 3, 9, OSM 1, OSM 2 <br />Ongoing: 4, 5, 6, 7 <br />Unresolved (with future deadline}: 8, OSM 3 <br />Unresolved (delinquent): none <br />V. BONDING <br />The Division has reviewed the bond for the Red Canyon Mine in <br />accordance with Rule 3.02.2(4). The current bond of E190,000.00 was <br />defined in January of 1984 and based on the Division's review using the <br />Dataquest Blue Book, rates have not increased significantly since <br />then. The full costs of reclamation for the approved Red Canyon No. 2 <br />Mine are included within the current bonded amount. As this <br />development and associated disturbance have not been realized and due <br />to the relatively stable rates for equipment operation, no adjustment <br />is required in the performance bond which is being maintained by Grand <br />Mesa Coal Company for the Red Canyon Mine at this time. <br />/dim <br />2648E <br />
The URL can be used to link to this page
Your browser does not support the video tag.