Laserfiche WebLink
acccr,.plished using the available on site material. This <br />material will be pulled up from slopes that were made when - <br />the portal bench was constructed. This will be done by <br />using a excavator reaching down the slope as far as pos- <br />Bible, placing material along base of highway_ <br />B. kemoval of guard trailer should be done by the owner upon <br />sufficient notification, when reclamation will begin. Af- <br />ter removal area will be re-sloped with available material <br />at the site. This material will be pulled up from the <br />slopes that were created when the trailer pad was made, no <br />additional material will be hauled in, the slopes will be <br />re-graded to the approximate contour and shape that e;:- <br />fisted prior to excavation. <br />S. Bact:-filling portal across roads. This road leading farm <br />the county road to the portal will be re-graded to the ap- <br />pro::imate oricinal shape with the available materials, <br />where there was nct r.:uch e::cavation recuired far road ccn- <br />str~:cticn. These areas will be ripped and re-graded to <br />pr~~vide a suitable m=_dium for seed development. Other <br />lir..ited :.'.se roads will be worked in the same manner. <br />:~. t;~_ ap?'i=able. <br />- 4 - <br />