Laserfiche WebLink
.te;r.s as~ated in the mine permit ~lication, an owner- <br />e <br />ship of the major equipment will have to be determined. <br />This item will be the first phase of the mine closure and <br />reclamation, at the cost of loading and hauling of the <br />heavier machines we intend to d^ this only once, or have <br />the owner of those items be responsible for their removal <br />t^ another off mine site. <br />5. Permanent sealing of back filling of the manway portal, <br />belt portal, and the fan portal. After e;:amining the por- <br />tals and their stability, it may be necessary to alter the <br />method of closure as depicted in figure ~ , in particular <br />the manway portal. A prefabricated metal gratings may be <br />~ . more practical and safe, in any case we will asl: the Mine <br />Safety and kzalth Administration to give their recommenda- <br />tions ar.d requirements. p~ h~~d ~~ it~J <br />wti•~ o~ f~``~r+*` ~^ <br />I~A/~ vII Y <br />b,7,?C;'ii Furial o= bacE;stowing from portal seals, including all un- <br />derground waste a.nd coal material present on the upper and <br />lower benches. Attempting to address this part of the re- <br />claic~ing p,^OCe55, it will be necessary to haul the coal <br />residues and fines from the lower bench area to the upper <br />bench a.nd =_pread out along the base ^f highway in tw^ f ^ct <br />lifts. ";here areas will be compacted by using a <br />s`oupefcct roller. This coal material will then be cov- <br />ed ~;,'h at le_s~ fear foot Or' ^or,-to::ic material. <br />hacl:-=illir.o of the remaining portal bench will be <br />- 3 - <br />