Laserfiche WebLink
Barringer Laboratories, Inc. <br /> Data Validation Checklist <br /> Radiochemistry Laboratory <br /> GENERAL <br /> GFPC ASPEC <br /> DET vs DATE DEr vs DATE <br /> C A <br /> Run ars D B <br /> E C <br /> F D <br /> G G <br /> H H <br /> DATES RUN aC RUN I <br /> KPA t5 DATE J <br /> Garme iS DATE <br /> Nat LSC-2550 <br /> BLI# epry)(OQOn Isotope_LjAjo—+ Sample#'S <br /> COMPILER I DAT — REVIEWER I DATE <br /> OK OK NO COMMENTS <br /> General <br /> Copies are legible. <br /> Bench Sheet and other Work Sheets <br /> All crosscuts are initaled and dated. <br /> 2 Data Review Form <br /> Filled out correctly and completely. <br /> Calibrations and Certificates <br /> 3 Standard cerfifiples are complete and have not expired (RF) <br /> Gamma-Calibration Reporls,(energy,efficiency,resolution <br /> 4 Prep Batch <br /> Completion date is entered. <br /> S Data Entry Summary <br /> All samples,QC,ACV's,Matrix Spikes are represented. <br /> 6 Miscellaneous Raw Data Report <br /> All samples,QC,ACVs,Matrix Spikes are represented. <br /> 7 Results Summary <br /> All samples,QC,ACVs,Matrix Spikes are represented. <br /> $ DVPSummary <br /> All samples,QC,ACVs,Matrix Spikes are represented. <br /> Control Charts <br /> Afl samples,OC,ACVs,Matrix Spikes are represented. <br /> g The+b 2&3 sigma,and the mean appear on all Control Charts. <br /> 8 data points exist prior to the dafe(s)of counting. <br /> 1 data point exists after the dale(s)of counting. <br /> All detectors are in control on the date(s)of counfing. <br /> 10 Run Logs <br /> All samples,OC,ACVs,Matrix Spikes are represented. <br /> Raw Data/Instrument Data <br /> All samples.QC.ACV's,Matrix Spikes are represented <br /> All sample counts match bench sheet? <br /> GFPC-Iola)count time reached? <br /> Umetco:Add COC before#10 <br /> URS:Add checklist before#11 <br /> 12f7Y 9 REVIEW L 67 b OVP <br />