Laserfiche WebLink
e.v,RaracR L.AD0R1n0RK.S. I e. <br /> 15000 W. 6rrr Avc- Sarre 300.Oot.oErr. CO 60401 <br /> PeaR�e�^vicw <br /> ULOMIORY: � REVIEM'ER: a .' oxtE: :2 9 PRO RE:14- )Fe L <br /> er,&sc Narrative: Completeness,spelling granmar,and accuracy will be reviewed The narrative will also <br /> be evaluated for its clarity and atlrnlioa to dimt specific requirements or cone n All <br /> —/ appropriate items from cads analyst narrative have been included in the ease narrative. <br /> Q QC Requirements: <br /> ❑ Calibration: ICAL&CCAL Mott Requircmcnts (Radiochemistry:uirat and KPA) <br /> Blanks: ~ Present and meet all QC RcquircmcnLz <br /> "pIMSIMSD: Present and must mat all QC Requirements(as required).(Radiochernistry: if transfeued <br /> / dups match,RER/RPD-0) <br /> V <br /> ,...,/n,Iding'I imes:)+j All prep.and analyses within holding times <br /> L� CSD: Present and meet all QC requiraocals(as required). <br /> Results: All results preset for each procedure and each sample based on what was logged in. All <br /> client spcafic requirements as outlined in SPR provided,have been met This includes: <br /> PAP-Ioper Method Used:Based on SPR or as logged in. <br /> 01/orrw Units for matrix and client <br /> (J Correa Detection limits for matrix and client. <br /> ,,.("rrect Significant Figures for matrix and client. <br /> LJ Chak calculations including initial and final volumes and dilution factors <br /> Q All results must be within instrument calibrated range-JV <br /> [•lags= All appropriate flags applied to data. (Radiochemistry: if spike passes but is outside 75- <br /> 125%flag data) <br /> i <br /> Data Transcription- All data has been properly transcribed from the raw data to the reporting sheets and is <br /> legible. Confirm that analyst is certified for this procedure. <br /> ;Zsimplc <br /> orrections: All crossouts and corrections dated and initialed. <br /> Prep.and AM holding times will be reviewed for compliance and any violations will be <br /> Analysis Dales- noted in the narrative. Check with sample prep logs and internal COC to confirm <br /> dates. <br /> ❑ A/ppnno« e: All data must be legible and complete. <br /> D/fhis checklist: This checklist should be preset and complete before submission of a job to the reporting <br /> department <br />