Laserfiche WebLink
<br />B. Water Quality. State how applicable state and federal water quality standazds will be met. <br />Describe measures or management practices to be used to minimize water qualify impacts and <br />meet apglicable standards. <br />1. State whether water is to be used in the operation, and descnbe the quantity, source, methods <br />and design of diversions, storage, use, disposal, and treatment facilities. Include assumptions for <br />sizing water conveyance or storage facilities <br />2. Describe methods to co~rol erosion and surface water runoff from all disturbed azeas, including <br />waste and tailings dumps. <br />3. Describe proposed surface water and groundwater quality monitoring, ' if required, to <br />demonstrate compliance with federal or state water quality standards. <br />4. Describe the measures. to be used to minimize potential water quality impacts during seasonal <br />closures, or for a temporary cessation of operations. <br />5. If land application is proposed for waste water disposal, the location and operation of the .land <br />application sys[eur must be described. Also describe how vegetation, soil, and surface and <br />groundwater quality will be protected if land application is used. <br />C. Solid Wastes. Describe the quantity and the physical and chemical characteristics of solid <br />waste produced by the operation. Describe how the wastes will be disposed of including <br />location and design of facilities, or treated SO as to n+inim; zP adverse impacts. <br />'All solid wastes will be reincorporated and re-countered into the backfills. <br />All minerals being extracted aze silicates. No secondary, harmful substances, such as oxides. acids. . <br />etc. aze.produced through ercposure to weathering and no chemical characteristics of these minerals <br />are damaeing to the environment. <br />D. .Scenic Vatues. Descn'be grotection of scenic values such as screening, slash disposal, or timely <br />reclamation. <br />Excavations are not located neaz an reopen water or intermittent streams. <br />No wastewater is produced nor is any agpreciable amounts of water used in this operation <br />(If more space is needed to,fill out a block of information, use additional sheets and attach to form.) <br />