Laserfiche WebLink
<br />D. Equipment and Vehicles. Describe that which is proposed for use in your operation (Examples: <br />dri21, dozer, wash plant, mill, etc.). Include: sizes, capacity, frequency of use, etc. <br />E. Structures. Include information about fixed or portable structures or facilities planned for the <br />operation. -Show Locations on the map. Include such things as living quarters, storage sheds, , <br />mill buildings, thickener tanks, fuel storage, powder magazines, pipelines; water diversions, <br />trailers, sanitation facilities inchtding sewage disposal, etc. Include engineering design and <br />geotechnicat information for project facilities, justification and calculations for siziag of tanks, <br />pipelines and water: diversious, etc: . <br />No structures wi11 be built. Nd powder magazines will be used. 1Vo fuel will be stored on site. <br />Mining activity will be conducted duting`the da~lighi hours. Personnel will remain on site only <br />durin¢ the active phase of mining when equi~merrt is on site. approximately 8 days a season. <br />Personnel wi11 camp an. or near the site. but never in excess of 14 days. Al~nnel will <br />'ce m;n;m?I-impact camping. All refuse will be removed from site to a sanitary landfill. <br />V. EIWTRONMENT~fL PROTECTION~ff~ASLIR,J4 (SEE 36CFIt 22&.~ <br />A. Air Quality. Describe measures proposed to minimiz impacts on air quality such as obtaining a <br />burning permit for slash disposal or dust abatement on roads. <br />Eaui~ment wiIi be roaded is once and removed once: unless a backhoe is bmuQht in for a second time <br />to complete reclamation. <br />(If more space is needed to fitl out a block of information, use additional sheets and attach to form. ) <br />Eairipment may be brought out a second tune to complete reclamahoa approxmtately in October. <br />