Laserfiche WebLink
<br />B. Bond. Reclamation of all disturbances connected with this plan of operations is covered by <br />Reclamation Performance Bond No. ,dated signed by <br />(Principal) and (Surety), for., the penal sum of <br />This Reclamation Performance Bond is a guarantee. of faithful performance <br />with the terms and conditions listed below, and with the reclamation requiremeiffs agreed upon <br />. in the plan of operations. This Reclamation Performance Bond also extends to and includes any <br />unauthorized activities.conducted in connection with this operation. <br />77ie bond amount for this Reclamation Perfomrance Bond was based on a bond calculation <br />worksheet. The bond amoum may be adjusted during the term of this proposed plan of <br />operations in response to changes in the operations or to changes in the economy. Boat the <br />' Reclamation Performance Bond and the bond caicnlatioa worksheet are attached to and made <br />part of this plan of operations. <br />Acceptable<bond securities (subject to change) include: <br />1. Negotiable Treasury bills and notes which are unconditionally guazameed as to both~principle <br />and interest in as amount equal at their par value to the penal sum of the bond; or <br />" 2. Certified or cashier's check, bank drag, Post Office money order; cash, assigned. certificate of <br />deposit, assigned savings accouct, blanket bond, or an irrevocable letter of credit equal. to the <br />penal sum'of the bond. <br />Yf7. TIItMSAND.CONDllIONS . -. <br />A. )f a bond is required, it must be furnished before approval of the plan of operations. . <br />B. Information provided with this plan marked confidential will be treated in accordance with the <br />agency`s laws; rules; and regulations. <br />C. Approval of this plan does not constitute certification of ownership to any person named herein <br />andlor recognition of the validity of nay mining claim named herein. <br />D. Approval of this plan does not relieve me of my responsibility to comply with other applicable <br />state or federal laws, rules, or regulations. <br />E. If previously undiscovered cuhural resources (historic or prehistoric objects, artifacts, or sites) <br />are exposed as a result of operations, those operations will not proceed until notification is <br />received from the Authorized Officer that provisions for mitigating unforseen impacts as <br />required by 36 CFR 228.4(e) and 36 CFR 800 have been complied with. <br />F. This plan of operations has been approved for a period of or until <br />A new or revised plan must be submitted in accordance with 36 CFR part 228, subpart A, if <br />operations aze to be continued atler that time period. <br />VIII O PE R 4 T Il Y 6 PL A N r f C C E P 7A N CE <br />UWe have reviewed and agreed to comply with all conditions in this plan of operations including the <br />required changes, modifications, special mitigation, and reclamation requirements. I/We understand <br />