Laserfiche WebLink
i <br />3. Describe the measures to be taken for release of a reportable quantity of a hazardous material or <br />the release of a toxic substance. This includes plans for spill prevention, containment, <br />notification, and cleanup. <br />There will be no release of toxic materials due to this operation. <br />Additionally, the mined substanees do not produce anytoxie substances. <br />H. Reclamation. Describe the annual and final reclamation standards based on the anticipated <br />schedule for construction;.operations, and project closure, Include such items as the removal. of <br />structures .and facilities .including ..bridges .and culverts, a revegetation plan, permanent <br />comainment of mine tailings; waste, or sludges which pose a threat of a release into the <br />environment, closing ponds and eliminating standing water, a final surface shaping plan, and <br />post operations monitoring and riraitrtenance plans. <br />growth is achieved and the habitat has been returned to a productive status. <br />VL FORESTSERYICEEYALUATIONOFPLANOFOPERAT70NS <br />A. Required changes/modificationslspecial mitigation for plan of operations: <br />/If more space is needed to fill out a block of information, use additional streets and attach to jorm) <br />will then be spread and the erouhd will be reseeded usine an approved seed mix. Whenever <br />