// <br />Colorado Mined Land Reclamation Division <br />Coal Regulatory Program <br />RECLAMATION COST SURVEY - FOLLOW UP QUESTIONNAIRE <br />Based on your previous responses to the attached survey, please respond to the <br />following questions: <br />1. Given the level of information provided in the original survey regarding <br />site conditions, material volumes and characteristics, and job layout, <br />what dollar amount do you feel would represent the lowest probable bid <br />price for the job? Please add any comments you feel are appropriate. <br />2. What dollar amount do you feel would represent the highest probable bid <br />price for the job? <br />3. In general, at what minimum size earthwork job would you most likely <br />elect to perform on a multiple shift basis as opposed to a single shift <br />basis? Stated differently, at what cubic yard volume would you start to <br />consider using multiple shifts to do the work as opposed to single <br />shifts, assuming no job scheduling restrictions (for each set of figures, <br />circle the appropriate shift basis): <br />Single Multiple 0 CY - 500,000 CY <br />Single Multiple 500,000 CY - 1,000,000 CY <br />Single Multiple 1,000,000 CY - 2,000,000 CY <br />Single Multiple 2,000,000 CY - 3,000,000 CY <br />Single Multiple 3,000,000 CY - 4,000,000 CY <br />Single Multiple 4,000,000 CY - 5,000,000 CY <br />Single Multiple 5,000,000 CY - 6,000,000 CY <br />Single Multiple 6,000,000 CY - 7,000,000 CY <br />Comments: <br />1284f/scg <br />