Laserfiche WebLink
GP37 #200275200 Chronology <br />Page 2 of 2 <br />Top of embankment previously seeded is disturbed by operations; will require re-seeding <br />during final reclamation of lake area. Concrete block amroring is backfilled where 2004 <br />flows caused some erosion. <br />Loose concrete slabs that line dike-berm across from jetty are removed to allow river to <br />erode dike-berm, rather than be deflected with force back toward armoring. <br />MAY Spring run-off brings flow higher than in 20+ years. Water level reaches il~ top of the <br />jetty at the upstream end, but does iat overtop it FCM places c~crcle blocks and <br />earthen bulwark on top of jetty to prevent overtopping. (Pond constnrction and spillway <br />not yet complete; it is prudent to prevent river encroxhment until then.) <br />