Laserfiche WebLink
-4 - <br />Stipulation No. 6 (Revision of Original Stipulation No. 6) <br />WITHIN 6 MONTHS OF PERMIT ISSUANCE, THE APPLICANT MUST PROVIDE THE REGULATORY <br />AUTHORITY WITH AN ADDITIONAL ANALYSIS OF THE FILL (DISTURBED LANDS) AND ANY <br />OTHER DISTURBED MATERIAL WHICH WILL NOT BE TOPSOILED PRIOR TO REVEGETATION. <br />THIS ANALYSIS SHALL CONSIST OF A SINGLE COMPOSITE SAMPLE OF THE SURFICIAL 6 <br />INCHES OF MATERIAL TAKEN FROM SEVERAL LOCATIONS ON THE BENCH. THE SAMPLE <br />SHALL BE ANALYZED, AT A MINIMUM, FOR pH, ELECTRICAL CONDUCTIVITY AND SODIUM <br />ADSORPTION RATIO. IF THE ANALYSIS INDICATES THAT THE MATERIAL IS NOT SUITABLE <br />AS PLANT GROWTH MEDIUM, THE APPLICANT SHALL REVISE THE PERMIT APPLICATION TO <br />PROVIDE AN APPROVABLE PLAN FOR SELECTIVE HANDLING AND ISOLATION OF THE <br />UNSUITABLE MATERIAL DURING REGRADING OPERATIONS. THE PLAN SHALL BE SUBMITTED <br />TO THE DIVISION WITHIN 60 DAYS FOLLOWING DATA COLLECTION AND ANALYSIS. <br />Stipulation No. 7 (Original Stipulation No. 7) <br />TOPSOIL MUST BE ANALYZED FOR FERTILIZER ELEMENTS PRIOR TO SEEDING. IF THE <br />SOIL IS FOUND TO BE PHOSPHOROUS DEFICIENT, PHOSPHOROUS MUST BE INCORPORATED <br />INTO THE TOPSOIL DURING THE RESPREADING PROCESS. ANY OTHER FERTILIZER <br />ELEMENTS WHICH ARE DEFICIENT IN THE TOPSOIL SHALL BE ADDED AFTER ONE YEAR'S <br />GROWTH OF VEGETATION AT A TIME OF YEAR APPROVED BY THE DIVISION. <br />Stipulation No. 8 (Revision of Original Stipulation No. 8) <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE APPLICANT SHALL REUISE THE PERMIT <br />APPLICATION TO INCLUDE THE PLAN APPROVED AND INCORPORATED INTO THE MCCLANE <br />CANYON PERMIT APPLICATION FOR SURFACE MANIPULATION OF SOILS TO ENHANCE <br />MOISTURE RETENTION AND REDUCE EROSION DURING RECLAh1ATI0N. THE PLAN SHALL BE <br />INITIATED BY THE APPLICANT DURING RECLAMATION. <br />Stipulation No. 9 (Revision of Original Stipulation No. 12) <br />THE FOLLOWING WOODY PLANT DENSITY REVEGETATION SUCCESS STANDARD IS PROPOSED BY <br />THE DIVISION FOR THE MUNGER CANYON MINE: 500 STEMS/ACRE FOR THE GREASEWOOD, <br />BIG SAGEBRUSH, AND SHADSCALE COMMUNITIES, AND 1,500 STEMS/ACRE FOR THE <br />PINYON-JUNIPER COMMUNITY. WITHIN 60 DAYS OF PERMIT ISSUANCE, THE PERMITTEE <br />SHALL EITHER REVISE THE PERMIT APPLICATION TO COMMIT TO USE OF THIS STANDARD <br />OR COMMIT TO AN ALTERNATE STANDARD AGREED UPON IN CONSULTATION WITH THE <br />DIVISION. <br />Stipulation No. 10 (Revision of Original Stipulation No. 13) <br />THE FOLLOWING SPECIES DIVERSITY REVEGETATION SUCCESS STANDARD IS PROPOSED BY <br />THE DIVISION FOR THE MUNGER CANYON MINE: 3 COOL SEASON GRASSES, 2 WARM SEASON <br />GRASSES, AND 2 FORBS BE ESTABLISHED, AT A MINIMUM; NO ONE SPECIES OF WHICH IS <br />TO COMPRISE MORE THAN 40Y OF THE RELATIVE VEGETATIVE COVER. WITHIN 60 DAYS OF <br />PERMIT ISSUANCE, THE PERMITTEE SHALL EITHER REVISE THE PERMIT APPLICATION TO <br />COMMIT TO USE OF THIS STANDARD OR COMMIT TO USE OF AN ALTERNATE STANDARD <br />AGREED UPON IN CONSULTATION WITH THE DIVISION. <br />