-3- <br />Stipulation No. 1 (Original Stipulation No. <br />SIX MONTHS PRIOR TO THE DRIVING OF ROCK SLOPES WITHIN THE MUNGER CANYON MINE <br />FROM THE CAMEO COAL SEAM TO THE UPPER CARBONERA COAL SEAM, THE APPLICANT MUST <br />SUBMIT GEOCHEMICAL AND PHYSICAL ANALYSES OF THE UPPER CARBONERA ROOF AND FLOOR <br />STRATA AND ALL INTERBURDEN STRATA BETWEEN THE CAMEO AND UPPER CARBONERA COAL <br />SEAMS WHICH WILL BE ENCOUNTERED IN THE ROCK SLOPES. <br />Stipulation No. 2 (Revision of Original Stipulation No. 2) <br />WITHIN 60 DAYS OF PERMIT ISSUANCE, THE APPLICANT MUST REVISE THE PERMIT <br />APPLICATION TO COMMIT TO INSTALLING AN APPROVED DEWATERING DEVICE AT THE <br />PROPOSED COAL PROCESSING WASTE DISPOSAL AREA SEDIMENT POND. THE DEWATERING <br />DEVICE MUST BE DESIGNED TO DEWATER THE POND TO THE MAXIMUM SEDIMENT STORAGE <br />LEVEL. ADDITIONALLY, WITHIN 60 DAYS OF PERMIT ISSUANCE THE APPLICANT MUST <br />REVISE THE PERMIT APPLICATION TO COMMIT TO INSTALLING A SEDIMENT CLEAN OUT <br />MARKER AT EACH OF THE SIX SEDIMENT PONDS TO BE CONSTRUCTED THAT INDICATES THE <br />LEVEL AT WHICH SUFFICIENT STORAGE CAPACITY REMAINS FOR BOTH RUNOFF AND <br />SEDIMENT GENERATED BY THE 10-YEAR, 24-HOUR STORM EVENT. <br />Stipulation No. 3 (Original Stipulation No. 3) <br />THE APPLICANT MUST SUBMIT TO THE REGULATORY AUTHORITY AN ANNUAL REPORT <br />CHARACTERIZING THE INFLOWS, DISCHARGES AND THE CONSUMPTION OF WATER WITHIN THE <br />MINE. THIS REPORT IS TO INCLUDE A CURRENT MINE WORKINGS MAP SHOWING THE <br />LOCATION AND QUANTITY OF INFLOWS: A TABLE KEYED TO THE MINE MAP WHICH SHALL <br />CONTAIN THE SOURCE (i.e., FAULTS, FRACTURES, ETC.), QUANTITY, DURATION, AND <br />QUALITY (i.e., pH, ELECTRO-CONDUCTIVITY AND TEMPERATURE) OF ALL NON-SEEP <br />INFLOWS; A TABLE CONTAINING RECORDS OF WATER DISCHARGED FROM THE MINE, <br />CONSUMED IN THE MINE AND IMPORTED FOR USE WITHIN THE MINE; A DISCUSSION OF THE <br />WATER BALANCE WITHIN THE MINE; AND, A PROJECTION OF HYDROLOGIC IMPACTS OF <br />MINING IN THE UPCOMING YEAR. <br />Stipulation No. 4 (Revision of Original Stipulation No. 4) <br />WITHIN 60 DAYS OF DIVISION APPROVAL OF THE PERMIT REVISION APPLICATION, THE <br />APPLICANT MUST REVISE THE PERMIT APPLICATION TO COMMIT TO GATHERING AN <br />ADDITIONAL YEAR OF QUARTERLY WATER QUALITY DATA (pH, ELECTRO-CONDUCTIVITY AND <br />TEMPERATURE) AND MONTHLY WATER LEVELS BEGINNING IN THE THIRD QUARTER OF 1985, <br />FOR WELLS GW-2, GW-3, GW-4, GW-5, MW-5, GW-7 AND GW-8. THE RESULTS OF THIS <br />MONITORING SHALL BE SUBMITTED TO THE DIVISION ON A QUARTERLY BASIS WITHIN 30 <br />DAYS AFTER DATA COLLECTION AND ANALYSIS. <br />Stipulation No. 5 (Original Stipulation No. 5) <br />THE APPLICANT SHALL NOT MINE MORE THAN 100,000 TONS OF COAL ANNUALLY UNTIL <br />THEY HAVE OBTAINED A REVISED AIR QUALITY PERMIT FROM THE COLORADO DEPARTMENT <br />OF HEALTH FOR THE HIGHER PRODUCTION LEVEL. A COPY OF THE PERMIT MUST BE <br />FORWARDED TO THE DIVISION UPON RECEIPT. <br />