Laserfiche WebLink
Technical Revision No. 19 was received August 18, 1992, and included certification of consUvction <br />for Pond 005. The revision was approved on November 16, 1992. <br />Technical Revision No. 20 was received October 7, 1992, and included construction certification <br />for Haul Road G. The revision was approved on November 16, 1992. <br />Minor Revision No. 15 was received March 8, 1991, and proposed expansion of Topsoil Stockpile <br />N, and a resulting increase in total mine related disturbance. The revision was denied on March <br />15, 1991, since the proposal required submittal of a technical revision. <br />Minor Revision No. 16 was received May 8, 1991,.requesting permission to relocate culvert A-8. <br />The revision was approved May 29, 1991. <br />Minor Revision No. 17 was received January 8, 1992, and included reformatted pages which were <br />previously approved in Technical Revisions No. I1 and No. 12. The revision was approved on <br />January 17, 1992. <br />Minor Revision No. 18 was issued in the field on January 16, 1993. The revision included <br />relocation of culvert F-3 and construction of a sediment catchment sump at the base of Topsoil <br />Stockpile GG. Approval of the culvert relocation was later rescinded, resulting in partial approval <br />of the revision on March 3, 1992. <br />Minor Revision No. 19 was received on Apri130, 1992, and informed the Division of dewatering <br />of trenches for the construction of the embanlonent of Pond 005. The revision was approved on <br />May 4, 1992. <br />Minor Revision No. 20 was received May 26, 1992, in response to Stipulation 19 placed on the <br />permit at the time of approval of Technical Revision 16. The submittal included results of a <br />geotechnical investigation of the Road G and Pond 005, and proposed stability monitoring locations. <br />The revision was approved on June 4, 1992. <br />Minor Revision No. 21 was received August 21, 1992, and included a proposed mining sequence <br />change in the neck area between the north and south blocks. The revision was approved on August <br />26, 1992. <br />Minor Revision No. 22 was received April 19, 1993, and included a monitoring plan for the <br />landslide between Road A and the Pond 006 spillway. The revision was approved May 7, 1993. <br />Minor Revision No. 23 was received May 13, 1993, and included proposed exploration activities <br />for the Dry Creek underground reserves within the Seneca II-W Mine permit boundary. The <br />revision was approved May 28, 1993. <br />Minor Revision No. 24 was n~eived June 25, 1993, and included plans for repair of the Road <br />A/Pond 006 IandsGde. The revision was approved July 29, 1993. <br />Seneca II-W Mine Page 4 <br />