Laserfiche WebLink
8- <br />The operator should review these calculations and submit any information <br />which would substantiate lower bonding costs. This information should be <br />specific, and could involve changes in such areas as: <br />a. Volumes, haul distance, and push distances for earthwork; <br />b. Production rates of machinery; <br />c. Machinery rental and operating rates; <br />d. Construction specifications for buildings and facilities and/or <br />substantiated demolition estimates. <br />The operator should be aware that indirect costs must remain in the estimate. <br />The Division would be happy to answer any questions about what types of <br />information are required to substantiate bond costs. <br /> Twin Pines Division <br />Item Estimate Estimate <br />Portal Sealing E 5,610 E 7,664 <br />Facilities Demolition 23,920 29,717 <br />Backfilling <br />Lewis Gulch 11,160 6,664 <br />Spoil Pile 2,000 846 <br />Sale Yard 4,960 1,059 <br />Ripping 0 1,112 <br />Sediment Pond Removal 0 100 <br />Road Reclamation 480 0 <br />Revegetation 6,000 7,470 <br />Mobilization 0 1,500 <br />Total Direct $34•;T3if ~T37 <br />Indirect Costs 0 11,552 <br />Total Costs $5~;T36 ~bT,-68~F <br />The Division would be happy to assist the operator in preparing the bond <br />calculations if requested. <br />/bdc <br />0754E <br />-8- <br />