Laserfiche WebLink
XVI. Explosives - Rules 2.05.3(6) and 4.08 <br />The specific findings required under this section which were made in the <br />February, 1988 Findings Document (Renewal) have not been modified by the <br />proposed revision and those findings remain applicable. <br />The proposed operation is in compliance with the requirements of this <br />section. <br />XVII. Backfilling and Grading - Rules 2.05.3(3). 2.05.3( <br />The specific findings required under this section which were made in <br />February, 1988 Findings Document (Renewal) have not been modified by the <br />proposed revision and those findings remain applicable. Minor Revision <br />36 approved by the Division on November 14, 1990 and Technical Revision <br />22, approved September 24, 1990, modified the original reclamation plan. <br />This information has been included in the permit revision. <br />The proposed operation is in compliance with the requirements of this <br />section. <br />XVIII. Coal Processing Waste and Non-Coal Processing Waste - <br />Since this is a "reclamation only" permit, this section no longer applies. <br />The proposed operation is in Compliance with the requirements of this <br />section. <br />XIX. <br />Minor revision 33, approved by the Division on July 9, 1990 for the <br />retention of the old and new shop buildings, two trailers, concrete pad, <br />truck turnaround, and the access roads to the East Fill Area and <br />Stollsteimer Creek, has been included into this permit revision. All <br />other roads, structures, and facilities have been removed in accordance <br />with the approved reclamation plan. The only structures that need to be <br />reclaimed are the ponds and sediment trap which is included in this <br />revision's reclamation plan. <br />The proposed operation is in compliance with the requirements of this <br />section. <br />XX. Bonding - Rules 2.05.4(2)(b) and 3 <br />The specific findings required under this section which were made in the <br />February, 1988 Findings Document (Renewal) have not been modified by the <br />proposed revision and those findings remain applicable. <br />The proposed operation is in compliance with the requirements of this <br />section. <br />