Laserfiche WebLink
RECLAMATION COST SUMMARY cont'd sheet 4 of 4 <br />K. PORTAL/SHAFT SEALING <br />Task No.~ Task Description ~ Lost (E) <br />________I__________________________________________________I____________ <br />________________________________________________________________________ <br />Subtotal (K): <br />L. DRILL HOLE/MONITORING HELL SEALING <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />________________________________________________________________________ <br />Subtotal (L): <br />M. MISCELLANEOUS RECLAMATION TASKS <br />Task No.l Task Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />6 ~ Demolition assume 5'H" 5'N' 10'L mass a E0.22/cf~ E55 <br />4 ~ Seeding per attached Task 4 worksheet ~ E5,834 <br />Fencing <br />5 ~ Mob/Demob per attached Task 5 worksheet ~ E687 <br />________________________________________________________________________ <br />Subtotal (M): E6,576 <br />TOTAL DIRECT RECLAMATION COSTS (subtotals A through M): E9, 923 <br />I1. INDIRECT COSTS <br />______________________________________ <br />A. CONTRACTOR'S OVERHEAD 8 PROFIT <br />Item No.~ Item Description ~ Lost (E) <br />1. ~ Public Liability Insurance.... 1.550% of dir. ~ E154 <br />2. Contractor's Performance Bond 0.975Y. of dir. ~ E97 <br />3. ~ Contractor's Profit........... 10.OOX of dir. ~ E992 <br />4. ~ Job Superintendenc..eq. op. serves as super <br />Subtotal (A ): E1,243 <br />TOTAL CONSTRUCTION CONTRACT AMOUNT (direct plus 0 8 P): 511,166 <br />B. DMG PROJECT ADMINISTRATION EXPENSES <br />Item No.l Item Description ~ Cost (E) <br />________I__________________________________________________I____________ <br />1. ~ Minerals Program Admin. Fee at S.OOX of cnt r.l E558 <br />NET INDIRECT COST PERCENTAGE: 18. 15X Subtotal (B): E558 <br /> <br />TOTAL INDIRECT <br />RECLAMATION __________ <br />COSTS (subtotals _ <br />A through B): ___________ <br />E1,801 <br /> <br />TOTAL PERFORMANCE <br />BOND AMOUNT _ <br />(direct plus indirect costs): ___________ <br />E11, 724 <br />