Laserfiche WebLink
<br /> <br />RECLAMATION LOST SUMMARY cont'd sheet 3 of 4 <br />H. EART HIlORK STREAM CHANNEL RECONSTRUCTION <br />Task No.~ Task Description ~ Cast (E) <br />Subtotal (H ): <br />I. EARTHWORK DRAINAGE CONTROL SYSTEM INSTALLATION/REMOVAL <br />Task No.~ Task Description ~ Cost (E) <br />________I__________________________________________________I__________ <br />~_ <br />Subtotal (I): <br />J. EARTHNORK TOPSOIL/SUBSOIL REPLACEMENT <br />Task No. Task Description ~ Cost (E) <br />_______________.,__________________________________________I___________ <br />2 ~ Topsail replacement, 0.5' depth, for ~ E94 <br />Phase I pond inslopes above water line. <br />See attached drawing, "Highwall Reduction" <br />Subtotal (J ): E94 <br />