My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997-09-26_PERMIT FILE - M1997053
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M1997053
>
1997-09-26_PERMIT FILE - M1997053
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/26/2024 1:09:04 PM
Creation date
11/23/2007 9:52:27 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997053
IBM Index Class Name
Permit File
Doc Date
9/26/1997
Doc Name
RECLAMATION COST SUMMARY FORM
Media Type
D
Archive
No
Tags
DRMS Re-OCR
Description:
Signifies Re-OCR Process Performed
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />COZER COST d PERFOR.y LVCE DATA IJORXSHEET cont'd sheet 2 of 2 sheets <br />Hode1: Cat DBN <br />ADJUSTED COST SUBTOTALS <br />~--••-•---------~-------~- --- L~+nership Cos[s •-- --~----••~ •----~---------• --- Overhaul d Operating Costs -~--~---•------------ <br />~ Dozer. BOPS d Attachment ~2: ~ Dozer d ROPS: <br />~ Single shifts 521. 62 59.85 510.65 55.04 f14.6L 55.59 511. 74 510.44 13.28 50.00 51.55 ' <br />~ Double shi f[s 516. 22 54.92 55.33 Attachment 92: <br />~ Triple shifts <br />I 514. 42 23.28 53.55 <br />I 50.84 51.68 51.53 51. 41 50.00 50.29 50.00 50.93 <br />HOURLY OPERATOR WAGES <br /> Base Fringe F.I.C.A Unempl. Wk. Comp . Total ~ Shift ~ <br />labor Classification Rate Benefits 7.70.. 6.20; 12 .50; (S/hr)~ Differential ~ <br />Dozer operator (~ 10hp) 514.32 53.96 51.10 50.89 51 .79 522.06 ~ Oay 50.00 ~ 2 shift/day avg.: 50.15 <br />Dozer operator (>=70hp) 516.02 53.96 31.16 50.93 SI . 88 322.95 ~ Swing: 50.30 ~ 3 shift/day avg.: 50.25 <br />Mechanic 615.32 57.96 51.14 50.95 51 .92 323.32 ~ Night: 60.45 ~ <br />HOURLY EQUIPMENT COST SUMMARY <br /> ~ Ownership ~ Operating d Overhaul Costs ~ Operator ~ Total <br /> ~ Costs ~ Oozer Ripper ~ Costs ~ Cost/HR (S) <br />Single shifts 542.12 552.25 56.68 522.95 5124. 00 <br />Oouble shi f[s 625.47 552.25 S6.6d 523.10 5108. 50 <br />Triple shifts 521.25 552.25 56.68 527.20 3107. 38 <br />EQUIPMENT PERFOR,4ANCE DATA <br />- - - EOUIPMENT SPECIFICATIONS - - - <br /> Horsepower Trans. Height Length Width Height Fuel Ripper <br /> Description (FHP) Type (tons) (ft.) (f [.) (Tt.) Type Type <br />MACHINE MARE d MCOEL: Ca[ 08N 285 Powe rshift 29.5 20.5 10.0 11.3 diesel N/A <br />COZER BLPDE: SERI-UNIVERSAL N/A N/A 5.1 N/A 12.9 5.5 N/A N/A <br />ATTACHMENT @1: ROPS Cab N/A N/A N/A N/A N/A N/A N/A N/A <br />ATTACHMENT lit: 3-shank ripper N/A N/A 4.9 4.8 8.1 2.6 N/A Adj. Parallelogram <br /> Total Wt.: 39.5 tons <br />
The URL can be used to link to this page
Your browser does not support the video tag.