Laserfiche WebLink
i • <br />III. B. Cont.........Robinson Brick - Ute Nine <br />Spring of 1984, topsoil was spread over area 3-4" deep. <br />A cover crop of 25-30H oats was drilled around April 15 <br />over entire test area. <br />Fall of 1984, test grasses will be drilled into oat stubble <br />acording to plan. See attach^~ents. <br />IV. A. SCS RESPONSIBILITIES <br />1. SCS shall provide technical assistance <br />in the planning, planting, and follow- <br />up to insure a successful field planting. <br />2. SCS through its plant materials centers <br />will provide the seed and planting stock <br />as indicated in Section III of this plant- <br />ing guide if available. <br />3. SCS will provide annual follow-up evalua- <br />tions on the field planting. <br />