Laserfiche WebLink
<br />ROCKCASTLE COMPANY <br />BOND RELEASE REQUEST <br />The Rockcastle Company (Rockcastle) pursuant to an Agreement with the <br />Colorado Mined Land Reclamation Division (CMLRD) dated June 26, 1990 and <br />applicable provisions of Rule 3.03, is requesting bond release for the following <br />specific categories and reclaimed areas; <br />PHASE I-III BOND RELEASE (_Final bond release) <br />- Pit 2 Area (Reseeded Fall, 1980 - 27.6 acres) <br />PHASE I-II BOND RELEASE_ All functions throuah_and including veaetativ <br />reestablishment) <br />- Pit 1 Area (Reseeded Fall, 1981 - 14.3 acres) <br />- Pit 3 Area (Reseeded Fall, 1981 - 30.1 acres) <br />- Pit 5 Area (Reseeded Fall, 1984 - 22.3 acres) <br />- Pit 6 Area (Reseeded Fall, 1985 - 10.6 acres) <br />PHASE I BOND RELEASE ~Backfilling. grading. and drainacLe control) <br />- Pit 4 Area (Reseeded Fall, 1990 - 136.8 acres) <br />Descriptions of reclamation status and bond release justification follow for each <br />of the reclaimed areas. <br />Pit 1 <br />The Pit 1 area, involving limited disturbance of approximately 14.3 acres, was <br />backfilled and regraded, topsoil was replaced, and the area was reseeded in <br />1980 - 1981. As documented by Appendix A, Evaluation of Postmining <br />Configuration Relative to AOC Requirements, to this bond release request, <br />1 <br />