My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38678
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38678
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:21 PM
Creation date
11/23/2007 9:47:51 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977211
IBM Index Class Name
General Documents
Doc Date
12/10/2001
From
JERRY HERMANS
To
LARRY OEHLER
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
52
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 6 Colorado Department of Public Health and Environment ..~:;~' <br />Construction Permit Air Pollution Control Division ~' <br />CASTLE CONCRETE COMPANY. Pikeview Quarry operations = r' <br />Permit No. 85EP365F -;;.,;. <br />- Final Approval -Modification-1 <br />GENERAL TERMS AND CONDITIONS: (IMPORTANTI READ ITEMS 5.6.7 AND 8) <br />1. This permit is issued in reliance upon the accuracy and completeness of information supplied by the applipnt and <br />is conditioned upon conduct of the activity, or construction, installation and operation of the source, in accordance <br />with this information antl with representations matle by the applicant or applicant's agents. It is valid only for the <br />equipment and operations or activity specifically identified on the permit. <br />2. Unless specifically stated otherwise, the general and specific conditions contained in this permit have been <br />determined by the APCD to be necessary to assure compliance with the provisions of Section 25.7-114.5(T)(a), <br />C.R.S. <br />3. Each and every condition of this permit is a material part hereof and is not severable. Any challenge to or appeal <br />of, a condition hereof shall constitute a rejection of the entire permit and upon such occurrence, this permit shall <br />be deemed denied ab inifio. This permit may be revoked at any time prior to final approval by the Air Pollution <br />Control Division (APCD) on grounds set forth in the Colorado Air Quality Control Act and regulations of the Air <br />Quality Control Commission (AQCC), including failure to meet any express term or condition of the permit. If the <br />Division denies a permit, conditions imposed upon a permit are contested by the applicant, or the Division revokes <br />a permit, the applicant or owner or operator of a source may request a hearing before the AQCC for review of the <br />Division's action. <br />4. This permit and any required attachments must be retained and made available for inspection upon request at the <br />location set forth herein. With respect to a portable soume which is moved to a new location, a copy of the <br />Relocation Notice (required by law to be submitted to the APCD whenever a portable soume is relocated) should <br />be attached to this permit. The permit may be reissued to a new owner by the APCD as provided in AQCC <br />Regulation No. 3, Part B, Section III. B. upon a request for transfer of ownership and the submittal of a revised <br />APEN and the required fee. <br />5. Issuance (initial approval) of an emission permit does not provide 'final' authority for this activity or operation of this <br />source. Final approval of the permit must be secured from the APCD in wdting in accordance with the provisions <br />of 25-7-114.5(72)(a) C.R.S. and AQCC Regulation No. 3, Part B, Section IV. H. Final approval cannot l>e granted <br />until the operation or activity commences and has been verified by the APCD as conforming in all respects with the <br />conditions of the permit. If the APCD so determines, it will provide written documentation of such final approval, <br />which does constitute 'final' authority to operate. Compliance with the permit condltloos must !x demonstrated <br />wlthln 180 days after commencement of operation. <br />6. THIS PERMIT AUTOMATICALLY EXPIRES IF you (1) do not commence construction or operation within 18 months <br />after either the date of issuance of this permit or the date on which such construction or activity was scheduled to <br />commence as set forth in the permit, whichever is later, (2) discontinue construction for a period of 18 months or <br />more: or (3) do not complete construction within a reasonable time of the estimated completion date. Extensions <br />of the expiration date may be granted by the APCD upon a showing of good cause by the permittee pdor to the <br />expiration date. <br />7. YOU MUST notify the APCD at least thirty days (fifteen days for portable sources) prior to commencement of the <br />pertnltted operation or activity. Failure to do so is a violation of Section 257-114.5(12)(a), C.R.S. and AQCC <br />Regulation No. 3, Part B, Section IV.H.1., and pn result in the revocation of the permit. You must demonstrate <br />compliance with the permrl condib'ons within 180 days after commencement of operation as stated in condition 5. <br />B. Section 257-114.7(2)(a), C.R.S. requires that all sources required to file an Air Pollution Emission Notice (APEN) <br />must pay an annual fee to cover the costs of inspections and administration. If a source or activity is to be <br />discontinued, the owner must notify the Division in writing requesting a cancellation of the permit. Upon notification, <br />annual tee billing will terminate. <br />9. Violation of the terms of a permit or of the provisions of the Colaredo Air Pollution Prevention and Control Act or the <br />regulations of the AQCC may result in administrative, civil or criminal enforcement actions under Sections 257-115 <br />(enforcement). -121 (injunctions), -122 (civil penalties), -722.1 (cdminal penalties), C.R.S. <br />047/0027/004 ver 11199 <br />
The URL can be used to link to this page
Your browser does not support the video tag.