.- <br />Subsequently, the Division solicited bids for completion of <br />reclamation of the West Pit. The low bid accepted by the Division <br />included an estimate of approximately $29,000 for the work <br />addressed in the agreement. The Division's $18,500 estimate was <br />apparently inadequate. The Division, the Corley Company and the <br />contractor doing the work have agreed to a plan for completing the <br />work which is acceptable to all parties. That plan is outlined in <br />the attached proposed agreement, which all parties have.agreed will <br />rectify the drainage problems in the GEC West Pit. <br />Incidently, the West Pit work is being done in conjunction with <br />reclamation of all post-law GEC disturbance on Dr. Corley's <br />property outsied of the "East Pit". Other than seeding, which may <br />be postponed by winter weather, this work should be completed by <br />the end of December. <br />Sincerely, <br />,,, <br />r Cv~,e <br />~.: <br />Larry Routten <br />Environmental Protection Specialist <br />cc: Dr. W.D. Corley <br />Erica Crosby <br />Steve Renner <br />enclosure <br />m:\coal\lpr\122393 <br />