Laserfiche WebLink
C, <br />• <br />features facilitate the post-mining land-use of rangeland. The operator is in compliance with <br />this part of the agreement. <br />Part 4a <br />The operator has submitted and implemented an approved drainage and sediment control <br />plan. Ditch repairs and modifications have been completed as per the approved fmal plan as <br />outlined in the information submitted October 16, 1991, November 26, 1991, January 21, <br />1992, and May 12, 1992. Pond modifications and reclamation has been completed as per the <br />approved plan outlined in the above plans. The operator has complied with this part of the <br />agreement. <br />Part 5 <br />The operator has submitted Map R-1 representing final topography generated from an aerial <br />flight dated 10/16/90. All areas with the exception of the slope above Pit 4 and the pond <br />reclamation at pond 2 and pond 3 were in their fmal configuration as of the date of the <br />flight. Field confirmation of the slope above Pond 4 and the areas reclaimed at ponds 2 and <br />3 indicate appropriate fmal contours for a stable, long term configuration. The operator has <br />complied with this part of the agreement. <br />Part 6 <br />This part of the agreement addresses the timeframes for review of the engineering studies <br />and is no longer relevant. <br />V. -Bond Release Procedures and Amounts <br />Parts 1-4 <br />Bond monies were released on an infrequent and irregular basis rather than on a monthly <br />