My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38559
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38559
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:17 PM
Creation date
11/23/2007 9:44:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981010
IBM Index Class Name
General Documents
Doc Date
12/14/1998
Doc Name
Proposed Decision & Findings of Compliance for SL1
From
Partial Phase II 1548 acres
Permit Index Doc Type
Findings
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
II. CHRONOLOGY OE THE REVIEW PROCESS <br />Settaration of Phase II from Phase I Evaluation <br />Trapper submitted the Phase [I bond release request (application) to the Division simultaneously <br />with a Phase [bond release request that became final iv(arch 19, 1993. The Phase [release included <br />the lands that are in the Phase [I request, alon_ with other lands. During the initial review of the two <br />requests it became apparent that as part of the Phase fI request, Trapper would need to submit an <br />additional sedimentologic analysis in order to demonstrate that the areas to be released are not <br />yielding suspended solids in e:ccess of premining conditions. Consequently, Trapper elected to have <br />the Division review the Phase II request separately from the Phase I request, hence the current Phase <br />[I review, findings, and proposed decision. <br />Previous Bond Releases <br />Prior to the combined Phase I/Phase II bond release application, there had not been any previous <br />bond release applications submitted by Trapper for the Trapper lvline. There had been a liability <br />release application submitted in September of 198 and approved in December of 1985. The liability <br />release, which did not involve any bond release, was for the Craig Generation Station Loadout. <br />Submittal Procedures <br />Trapper submitted the Phase II partial bond release request following the procedures described in <br />the Act. The request also utilizes the Division's Guideline Re2ardinp Selected Coal Mine Band <br />Release Issues, dated April 18, 1995. The bond release is only a release of reclamation work <br />liability. No adjustment in the dol]az amount of the bond will be made in this bond release. <br />Timin; of Reclamation and Bond Release Submittal <br />The Phase II bond release application (request) follows reclamation of portions of the Trapper Kline <br />that occurred from 1979 through 1995. The application for Phase II bond release was received by <br />the Division on September 9, 1996. The Division found the application complete on October 16, <br />1996, after the Division received proof of publication of the applicant's public notice. <br />Public Notice <br />Trapper published notice of the bond release application in the Northwest Colorado Daily Press <br />once weekly for four consecutive weeks, beginning on September 6, 1996. Trapper also notified <br />landowners within and adjacent to the mine permit area, and other interested. parties of the <br />application for bond release, as required by Section 3.03.2(1). <br />Trapper Mine Page 2 72/14/98 <br />Phase II Bond Release <br />
The URL can be used to link to this page
Your browser does not support the video tag.