Phase Nc Summary No. 16 Page 2 043-2170 <br />eastern portion of the VLF. SLF material was tested, conditioned, reworked, retested, and maintained <br />prior to SLF surface acceptance. <br />Ames continued excavation of the Phase IVc anchor trench on the eastern section of the Phase IVc <br />VLF. Ames excavated approximately 100 feet of anchor trench in preparation for geomembrane <br />installation during this reporting period. <br />Ames continued production of bentonite-amended SLF at the screen plant and pug mill located above <br />the Ames materials yazd. Ames also continued production of Drain Cover Fill (DCF) material at the <br />screen plant by the secondary crusher. <br />Poly-Flex continued deployment of 80-mil single-sided textured LLDPE geomembrane in the Phase <br />IVc OSA. Geomembrane was installed in the Phase IVc OSA on the south facing slope of Raven Hill <br />downward to the Phase IVb/IVc tie-in. Poly-Flex deployed 80-mil single-sided textured LLDPE <br />geomembrane over an azea of approximately 102,274 square feet in the Phase IVc OSA during this <br />reporting period. Geomembrane panels C-706 through C-735 were deployed, seamed, and tested by - <br />Poly-Flex. Destructive fusion and extrusion seam samples DFc-252 through DFc-262 and DXc-26 <br />through DXc-27 were mazked and removed. Destructive fusion and extrusion seam peel and sheaz <br />testing on samples DFc-236 through DFc-262, and DXc-26 through DXc-27 were performed and <br />passed per project specification. <br />Ames continued hauling, placement and grading of DCF material into the Phase IVc OSA in the central <br />and eastem sections of the VLF, Raven Hill azea. Ames placed DCF material and High Volume <br />Solution Collection (HVSC) piping per the project plans onto approved geomembrane panels. <br />A map of the area worked during this reporting period is provided in Attachment C. <br />Field Monitoring and Testing Activities <br />Golder observed construction activities associated with Phase IVc earthworks. All constmction <br />materials and soil materials placed were verified as suitable, and construction methods were in <br />accordance with project specifications. <br />Golder observed the excavation and construction of the LDT in the Phase IVc VLF for trench <br />dimensions (1' wide by 1' deep), slope, and materials used. <br />Golder observed excavation of the Phase IVc anchor trench for proper location, dimension (2' wide by <br />3' deep) and maintenance prior to geomembrane deployment. Anchor trench excavation met or <br />exceeded the requirements of the specification. <br />Golder observed placement, compaction, and moisture conditioning of SLF in the Phase IVc OSA for <br />subgrade preparation, thickness, compaction, moisture-content, and materials used. The Golder CQA <br />Earthworks Monitor performed seventeen nucleaz moisture-density tests (SLNc-202 through SLNc- <br />218) and performed five nucleaz moisture-density retests on SLF that required reworking (SLNc-212a, <br />SLNc-213a, SLNc-214a, SLNc-217x, and SLNc-218a). Field test results are presented in Attachment <br />B. <br />rnaz~rv~i5a~uzz-w ~za znoa Golder Associates lnc. <br />