My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38508
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38508
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:15 PM
Creation date
11/23/2007 9:42:39 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1980244
IBM Index Class Name
General Documents
Doc Date
9/10/2004
Doc Name
Construction Quality Assurance Report
From
CC&V
To
DMG
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
_~ =Golder <br />Associates <br />September 1, 2004 <br />Mr. Ron Roberts <br />Cripple Creek & Victor Gold Mining Company <br />P.O. Box 191 <br />2755 State Highway 67 <br />Victor, C0.80860 <br />Golder Associates Inc. <br />44 Union Boulevazd, Suite 300 <br />Lakewood, CO 80228 <br />(303)980-0450 <br />(303) 985-2080 <br />Golder Project No.: 043-2170 <br />12E: Summary No. 16: August 22 through August 28, 2004 <br />Cresson Project Phase IVc Construction Quality Assurance <br />Dear Mr. Roberts: <br />Golder Associates Inc. (Golder) is pleased to submit this summary of Phase Nc Construction Quality <br />Assurance (CQA) services performed for the Cresson Project during the period of August 22 through <br />August 28, 2004. <br />The weather during this reporting period was clear to cloudy. Approximate daytime low <br />temperatures ranged from 35° F to 47° F, and highs ranged from 50° F to 77° F. Weather <br />observations were made on seven days of this seven-day reporting period. <br />Construction Synopsis <br />Ames Construction Inc. (Ames) of Aurora, Colorado is the earthworks contractor for the Phase Nc <br />construction. Ames conducted Phase Nc construc6on activities on six days of this seven-day reporting <br />period (August 23 through August 28, 2004). Poly-Flex conducted Phase Nc construction activities on <br />six days of this seven-day reporting period (August 23 through August 28, 2004). <br />Phase Nc <br />Ames continued limited Structural Fill (SF) cut to fill and slope re-contouring activities along the Phase <br />Nb /Phase Nc tie-in area above the LOB. <br />Ames continued excavation and construction of two Leak Detection Trenches (LDT) in the eastern <br />portion of the Phase Nc VLF. Ames constructed approximately 150 feet of LDT during this reporting <br />period. Additionally, Ames constmcted approximately 250 feet of LDT extension outside the western <br />limits of the Phase Nc VLF and installed the western LDT collection sump. <br />Ames hauled, placed, and compacted Soil Liner Fill (SLF) material into the Phase Nc OSA, on the <br />Phase Nc 16 August 22-August 28, 2004 043-2170 <br />
The URL can be used to link to this page
Your browser does not support the video tag.