My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
GENERAL38351
DRMS
>
Back File Migration
>
General Documents
>
GENERAL38351
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 7:58:09 PM
Creation date
11/23/2007 9:38:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1984065
IBM Index Class Name
General Documents
Doc Date
10/1/1990
Doc Name
PROPOSED DECISION & FINDINGS OF COMPLIANCE FOR PR1
Permit Index Doc Type
FINDINGS
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
26- <br />STIPULATION N0. 20 <br />WITHIN SIX MONTHS OF THE FINAL APPROVAL DATE OF THIS REVISION, THE <br />PERMITTEE WILL SUBMIT A DETAILED DESIGN PLAN FOR THE COAL MINE WASTE <br />DISPOSAL STRUCTURE AS REQUIRED BY RULE 2.05.3(8)(ii). CONSTRUCTION OF <br />THE STRUCTURE WILL NOT BEGIN UNTIL THE DIVISION HAS APPROVED THE DETAILED <br />DESIGN, IN WRITING. <br />STIPULATION N0. 21 <br />IN ORDER TO MONITOR THE VOLUME OF COAL MINE WASTE MATERIAL DISPOSED OF IN <br />THE APPROVED PILE, THE STRUCTURE WILL BE SURVEYED BY A QUALIFIED <br />REGISTERED ENGINEER DURING EACH QUARTERLY SITE INSPECTION REQUIRED BY <br />RULE 4.10.2. THE PERMITTEE WILL SUBMIT A COMPLETE PERMIT REVISION <br />APPLICATION ADDRESSING ALTERNATIVE COAL MINE WASTE DISPOSAL PLANS BEFORE <br />THE VOLUME OF MATERIAL IN THE APPROVED PILE EXCEEDS 10,000 CUBIC YARDS. <br />IF NO ALTERNATIVE WASTE DISPOSAL PLAN IS APPROVED, MINING OPERATIONS WILL <br />CEASE WHEN THE APPROVED DISPOSAL PILE VOLUME REACHES 15,000 CUBIC YARDS, <br />AND THE PERMITTEE WILL INITIATE AND COMPLETE RECLAMATION OF THE ENTIRE <br />MINE SITE WITHIN SIX MONTHS OF THE CESSATION OF MINING. <br />Non-Coal Waste <br />Section 4.4.6 of the applicaiton <br />wastes. Non-liquid waste will be <br />yard, while liquid and flammable <br />outside the shop and outside the <br />at the county landfill. <br />discusses storage and disposal of non-coal <br />stored in the eastern part of the lay-down <br />wastes will be stored in steel containers <br />processing building. Final disposal will be <br />XIX. <br />These topics are addressed in Section 4.3.3 of the revision application. They <br />include the coal preparation plant, the pumping and coal sizing facility, coal <br />stockpile, offices, warehouse, changehouse, electrical substation, and the <br />water and sewage treatment plant. These facilities will be located in areas <br />of the site already disturbed. Coal handling structures include slurry <br />pipelines for raw coal, an emergency slurry holding tank, and a conveyor <br />leading from the preparation facility to the coal stockpile. These facilities <br />are mapped on figure 4.2-3. ' <br />NCEC has leased a 5-acre unit train loading facility, west of Rifle, Colorado, <br />from the Denver and Rio Grande Railroad. Permitting of this facility must be <br />handled through a separate Permit Revision process, in order to provide <br />adequate public notice of its location and opportunity for public comment, and <br />is specifically not approved at this time. <br />The proposed operation is in compliance with the requirements of this section. <br />
The URL can be used to link to this page
Your browser does not support the video tag.