Laserfiche WebLink
Stipulation No. 50 <br />DITCH DESIGNS ASSOCIATED WITH THE RELOCATED TOPSOIL PILE SHOULD BE <br />PROVIDED BY OCTOBER 18, 1993, TO BE INCORPORATED INTO EXHIBIT 66. THE <br />DESIGNS SHOULD REFLECT STORM EVENTS APPROVED IN TECHNICAL REVISION N0. 64 <br />AND SHOULD BE COMPLETED IN ASSOCIATION WITH TECHNICAL REVISION N0. 65. <br />UNTIL THAT TIME, DITCHES SHOULD BE CONSTRUCTED TO HAVE MINIMUM DESIGNS AS <br />REQUIRED BY DITCHES D1-4 AND DZ-2D. <br />This stipulation was added to the approval of Minor Revision No. 99. The <br />information required was submitted with Technical Revision No. 65. <br />STATUS: Complied with October 1, 1993. <br />Stipulation No. 51 <br />THE DIVISION 4 WATER COURT SHALL BE NOTIFIED OF THE NEW POND LOCATIONS <br />WITHIN 45 DAYS OF DMG'S PROPOSED DECISION. IN ADDITION, A DAM SAFETY <br />REVIEW SHALL BE COMPLETED ON MB-2 AND MB-3 WITHIN 45 DAYS AFTER <br />CONSTRUCTION OF THE PONDS IS COMPLETED. (COMMENTS RECEIVED FROM THE <br />DIVISION OF WATER RESOURCES DATED SEPTEMBER 17, 1993.) <br />This stipulation was added to the approval of Technical Revision No. 65. The <br />first portion of the stipulation (notification to Division 4 Water Court) was <br />complied with on December 10, 1993. As the second part of the stipulation has <br />not been complied with yet, the status will remain active. <br />STATUS: Active <br />5557E <br />12/93 <br />-15- <br />