Laserfiche WebLink
i ~ <br />i <br /> <br />~'1 <br />U <br />Revised 1/11/80 <br />Section 780.18(b) Continued <br />At each transect a total of 100 data points ~llected at five meter <br />intervals along a 50 meter transect will be taken. Production data to a <br />height of four feet will be collected by clipping five, 0.25m' circular <br />plots per transect. A minimum of 15 transects will be run per reference <br />area. <br /> <br /> <br />780-136(b) <br />