Laserfiche WebLink
<br />Section VI - Bonding Summary <br />The Division currently holds a total of $4,000,000.00 in corporate sureties and letters of credit for <br />the reclamation performance bond at the Seneca II-W Mine. Costs to reclaim the site were <br />estimated at $3,761,940.00, resulting in a required performance bond of $3,761,940.00. The <br />current liability has been determined to be more than adequate for the reclamation activities <br />required, in that it includes costs to reclaim Road H, which will not be constructed. <br />m: \coal\slm\midterm. wp <br />Seneca II-W Mine <br />Page 11 <br />