-4- <br />engineering redesign and amendment of the final reclaimed configuration of the <br />surface facilities area of the Orchard Valley Mine. This project shall proceed <br />in a timely fashion to completion by December 31, 1982. The Division shall be <br />kept informed by monthly letter of the progress of this task by the operator. <br />Upon completion of Phase III, the reclamation plan section of the Orchard <br />Valley mine plan shall be appropriately amended. <br />24, fJithin 30 days after the completion of Phase III of the stability analysis and <br />redesign of the final reclaimed configuration of the surface facility area <br />of the Orchard Valley Mine, the applicant must submit to the Division a <br />revised backfilling and grading cost estimate for the surface facility area. <br />If this revised cost figure is greater than the present estimate, the amount <br />of the reclamation bond will be increased accordingly. <br />25. f9hen the operator submits a permit application to undermine Stevens Gulch and/ <br />or East Roatcap Creek, the subsidence protection plan developed for these <br />areas should be based upon monitoring information collected during the earlier <br />phases of mining. <br />