Laserfiche WebLink
-z- <br />PROPOSE!, DECISION <br />Blue Ribbon Mine <br />The Colorado Mined Land Reclamation Division proposes to approve, with stipu- <br />lations, an application for a permit to conduct coal mining operations sub- <br />mitted by Blue Ribbon Coal Company for the Blue Ribbon Mine. <br />This approval decision is based on a finding that the proposed operation will <br />comply with the requirements of the Colorado Surface Coal Mining Reclamation <br />Act, C.R.S. 1973, as arrended, 34-33-101 et seq., and the Regulations promul- <br />gated pursuant to the Act. <br />The permit application and the stipulations will become a binding part of the <br />permit upon approval. The stipulations for the Blue Ribbon Mine are as <br />follows: <br />1. BLUE RIBBON COAL COt4PANY SHALL PROVIDE A 14AP WHICH SPECIFICALLY <br />INDICATES THOSE INTERVALS OF THE HAUL ROAD CUT SLOPES WHICH EXPOSE GREATER <br />THAN 10.5 FEET OF COLLUVIUM. IN ADDITION, CUT SLOPES ON THE HAUL <br />ROAD WHICH NAVE HAD VISUALLY PERCEPTIBLE MOVEMENT AT THE DATE OF <br />PERMIT ISSUANCE WILL BE INDICATED ON THE MAP. FOR BOTH AREAS <br />SPECIFIED ON THE MAP AS EITHER GREATER THAN 10.5 FEET OF COLLUVIAL <br />MATERIAL IN THE HAUL ROAD CUT SLOPES OR EXISTING AOVEMENT ZONES, <br />BLUE RIBBON COAL COMPANY SHALL COMPLY WITH RECOMMENDATIONS PERTAINING <br />TO REQUIRED SLOPE TREATMENT INCLUDED IN THE FORTHCOPIINC HAUL ROAD STUDY. <br />THE REQUIRED FIELD WORK, THE ABOVE-MENTIONED MAP, AND A REPORT DEFINING <br />CORRECTIVE AfEASURES, IF SLOPE TREATMENT IS REQUIRED, SHALL BE <br />SUBMITTED TO THE DIVISION FOR APPROVAL WITHIN 30 DAYS OF PERMIT <br />ISSUANCE. <br />2. BLUE RIBBON COAL COMPANY SHALL REVISE EXHIBIT F OR OTHERWISE AMEND THE <br />PERMIT APPLICATION TO ENSURE PROTECTION OF ESTABLISHED RIPARIAN VEGETATION <br />ADJACENT TO POND 1. A REVISED EXHIBIT F OR OTHER AMENDMENT DEMONSTRATING <br />PROTECTION OF THE RIPARIAN HABITAT MUST BE SUBh1I TTED TO THE DIVISION <br />WITHIN 30 DAYS OF PERMIT ISSUANCE. <br />3. BLUE RIBBON COAL COMPANY SHALL PROVIDE AN ACCEPTABLE STABILITY ANALYSIS <br />OF THE PROPOSED BACKFILLED CONFIGURATION OF ALL MINE FACILITIES AND THE <br />HAUL ROAD, INCLUDING AN APPROPRIATE MATERIAL SHEAR STRENGTH TESTING <br />REPORT. THIS STABILITY ANALYSIS SHALL DEMONSTRATE COMPLIANCE WITH THE <br />STATIC SLOPE SAFETY FACTOR REQUIREbfENTS OF RULE 4.27.4(1). THIS <br />ACCEPTABLE STABILITY ANALYSIS SlfALL BE SUBMITTED TO THE DIVISION WITHIN <br />60 DAYS OF PERMIT ISSUANCE. <br />The permit cannot be issued until aI1 statutory notice and public comment <br />requirements have been satisfied, and until bond has been posted. <br /> <br /> <br />