Laserfiche WebLink
• <br />windrow and from the large topsoil area to cover the gray and white <br />slope area. Topsoil from the east pit area are to be used to cover <br />the west slope area as priority number 1 followed by the north <br />slope and drainage and then the west side of the east pit. <br />Heavy rains and lighting started at 2:30 PM. Equipment continued <br />moving. I left at 3:OOPM. <br />