Laserfiche WebLink
'~.atttbert att~ ~acgotiattg <br />CONSULTING GEOTECHNICAL ENGINEERS AND MATERIAL TESTING <br />DAILY FIELD REPORT <br />PROJECT NUMBER: M98z09MT <br />PROJECT NAME: west Elk Mine cob Pile <br />PROJECT LOCATION:Somerset, Colorado <br />CLIENT: Chesnik Construction <br />CONTRACTOR: Chesnik Construction <br />DATE: Wednesday, 9-23-98 <br />TECHN I C 1 AN : Glendening <br />WEATHER CONDITIONS:Sunny <br />WORK REQUESTED:~ensity <br />tests <br />FOREMAN: <br />Mr. Chuck Chesnik <br />WORK PERFORMED BY LAMBERT AND ASSOCIATES REPRESENTATIVE AND REHARKS <br />I arrived at the project site at 4:00 P.M. as requested by Mr. Chuck Chesnik. <br />2 performed soil density tests as requested by Mr. Chesnik of material being <br />placed on gob pile using nuclear soil density test methods. Please refer to the <br />test results sheets for approximate test locations and test results. The test <br />area was determined by Mr. Chesnik. The test results indicate only the relative <br />compaction and soil moisture content of the material tested at the elevation and <br />location tested at the time of our site visit. <br />P. O. lOII 7W P. O. !OI OW{ 7,• SODO DR. <br />OMNO JUMGT1014 CO x/607 MOIf~R06[. W X1.02 DURAMOO, OD x,701 <br />m01 ~•s-.ea n,o».~:, s. Is~o1 xs-soss <br />